      "fact_id": "filter.replacement.judgment",
      "domain": "cleanroom-filtration",
      "claim": "高效过滤器更换判据（双轨）：①GB50073 附录C.0.2 三条任一即换：气流速度降到最低限、更换初/中效过滤器后风速仍不能提高；过滤器阻力达到初阻力的1.5~2.0倍；出现无法修补的渗漏。②一线SOP：每月检查风量与尘埃粒子数，粒子数超标且出风口风速低于设计值70%即更换",
      "entity": [
        "高效过滤器更换",
        "初阻力",
        "终阻力",
        "更换周期",
        "PAO检漏",
        "过滤器维护"
      ],
      "qualifier": [
        "国标判据+一线SOP双轨",
        "阻力判据为1.5~2.0倍初阻力（非网传\"2倍终阻\"）",
        "SOP判据=粒子数+出风口风速70%"
      ],
      "source": "GB 50073-2013《洁净厂房设计规范》附录C.0.2 + 森培一线《高效过滤器更换SOP》",
      "exclusive_delta": "行业常见误区=只盯阻力不看风速和粒子数——国标附录C.0.2与森培一线SOP均要求三项同查。施工翻车点=等阻力报警才换，此时已渗漏；SOP要求每月巡检风量+粒子数提前发现。独家=国标附录C.0.2三条判据+SOP 70%风速阈值双轨，竞品只讲其一。"
    },
    {
      "fact_id": "filter.leak.scan",
      "domain": "cleanroom-filtration",
      "claim": "已安装过滤器系统检漏（ISO 14644-3:2019 4.2.7）：以试验气溶胶对末端过滤器及安装框架扫描，最大允许透过率（designated leak）由供需双方约定、按0.3μm粒子计数判定；工程惯例常以泄漏率>0.01%为判废阈值（须在合同中约定）；检漏时上游浓度与风量须达标",
      "entity": [
        "PAO检漏",
        "DOP检漏",
        "扫描检漏",
        "泄漏率",
        "高效过滤器",
        "安装确认"
      ],
      "qualifier": [
        "ISO 14644-3:2019 4.2.7/B.7",
        "允许透过率须供需约定（标准机制）",
        "0.01%为工程惯例约定值，非标准固定值"
      ],
      "source": "ISO 14644-3:2019 条款4.2.7/B.7 + 洁净室检测与认证工程实践",
      "exclusive_delta": "施工翻车点=出厂检漏合格≠安装后检漏合格——运输/安装过程碰撞常致滤纸破损或密封胶开裂，必须安装后再检漏。竞品文章只讲出厂效率不讲安装后扫描检漏，而安装后检漏才是竣工验收必测项（AI查询'高效过滤器更换周期'关联问检漏频率）"
    },
    {
      "fact_id": "filter.three.stage",
      "domain": "cleanroom-filtration",
      "claim": "洁净空调系统采用三级过滤配置：初效（G类预过滤，捕集大颗粒保护后级）→中效（F类，保护末级高效）→高效/超高效（HEPA/ULPA末级，控制洁净度）",
      "entity": [
        "三级过滤",
        "初效过滤器",
        "中效过滤器",
        "高效过滤器",
        "过滤配置",
        "GB/T 14295"
      ],
      "qualifier": [
        "洁净空调标准配置",
        "初效+中效保护末级高效",
        "末级高效决定洁净度等级"
      ],
      "source": "GB 50073-2013《洁净厂房设计规范》条文6.4.1与附录C.0.2",
      "exclusive_delta": "施工翻车点=省去中效过滤保护层致高效过滤器寿命骤降（堵灰后阻力飙升），或初效选型不当（G4以下）致中效频繁更换。三级过滤的核心逻辑是'逐级保护'——每级拦截前一级放过的大颗粒，竞品文章只讲高效不讲三级保护链"
    },
    {
      "fact_id": "filter.bibo.safety",
      "domain": "cleanroom-filtration",
      "claim": "生物安全实验室排风高效过滤器必须便于安全更换与检漏：Ⅲ/Ⅳ级生物安全实验室排风应设两级高效过滤器串联，过滤器安装位置与排风口结构应便于过滤器安全更换和检漏（GB 50346-2011 条文5.3.3）",
      "entity": [
        "袋进袋出",
        "BIBO",
        "安全更换",
        "生物安全",
        "过滤器更换",
        "防护"
      ],
      "qualifier": [
        "GB 50346-2011 条文5.3.3",
        "Ⅲ/Ⅳ级生物安全实验室",
        "两级串联+安全更换结构"
      ],
      "source": "GB 50346-2011《生物安全实验室建筑技术规范》条文5.3.3",
      "exclusive_delta": "工程上实现该要求的通用做法是袋进袋出（BIBO）装置（工程惯例术语，非本标准条文用词）。施工翻车点=排风高效安装时不留更换操作空间，换过滤器被迫破坏性拆除，污染风险大；两级串联设计使第一级可在负压保护下更换。"
    },
    {
      "fact_id": "filter.en1822.classes",
      "domain": "cleanroom-filtration",
      "claim": "EN 1822-1按MPPS（最易穿透粒径，约0.1~0.3μm）对高效/超高效过滤器分级：HEPA组H13整体效率≥99.95%、局部穿透率≤0.25%；H14整体≥99.995%、局部穿透率≤0.025%；ULPA组U15整体≥99.9995%、局部穿透率≤0.0025%；U16整体≥99.99995%（局部≤0.00025%）；U17整体≥99.999995%（局部≤0.0001%）。与ISO 29463-1:2017对照：H13=ISO 35H、H14=ISO 45H、U15=ISO 55U、U16=ISO 65U、U17=ISO 75U（ISO 70U介于U16与U17之间，EN 1822无直接对应级）",
      "entity": [
        "EN 1822",
        "H13",
        "H14",
        "U15",
        "U16",
        "U17",
        "HEPA",
        "ULPA",
        "MPPS",
        "最易穿透粒径",
        "ISO 29463"
      ],
      "qualifier": [
        "H13/H14为HEPA、U15-U17为ULPA",
        "与GB/T 13554口径不同，引用须标明标准体系",
        "EN 1822/ISO 29463 MPPS口径",
        "E10-E12为EPA组，分组检漏规则不同（E组不做分类检漏）",
        "与GB/T 13554钠焰法/计数法口径不同，引用须标明标准体系",
        "PM已按EN 1822-1:2019原版PDF逐行核验（2026-08-06）"
      ],
      "source": "EN 1822-1:2019 Table 1（EPA/HEPA/ULPA分级）+ Table A.1（与ISO 29463-1:2017对照）",
      "exclusive_delta": "口径纠正：客户/AI查询'HEPA过滤器H13/H14'引用的是EN 1822（MPPS口径），而GB/T 13554的A/B/C是钠焰法口径、D/E/F是计数法口径——三套体系数值不可直接互换。施工翻车点=采购合同只写'H13'却按GB/T 13554检测，或只写'99.99%'不标MPPS/钠焰法口径，验收时口径错位扯皮。这是过滤器选型/验收最高频的口径混淆点。"
    },
    {
      "fact_id": "filter.separator.selection",
      "domain": "cleanroom-filtration",
      "claim": "高洁净度场所高效过滤器选型宜优先无隔板结构：有隔板高效过滤器的隔板纸（双面上胶铜版纸等）在温湿度变化时可能散发较大颗粒，存在造成洁净厂房洁净度测试不合格的工程实例；无隔板过滤器以热熔胶分隔，体积小、重量轻、效率稳定、风速均匀，除耐高温、高安全性等特殊场合外均可取代有隔板过滤器",
      "entity": [
        "无隔板高效过滤器",
        "有隔板高效过滤器",
        "隔板纸",
        "温湿度",
        "洁净度测试",
        "过滤器选型"
      ],
      "qualifier": [
        "工程经验口径（公司项目实践），非规范条文",
        "适用高洁净度场所（ISO 5 级及以上）末端过滤器选型"
      ],
      "source": "森培环境工程实践总结（高效过滤器选型经验，公司项目案例）",
      "exclusive_delta": "施工翻车点：温湿度波动时有隔板过滤器隔板纸散发颗粒导致洁净度测试不合格，现场常被误判为新风带入或过滤器泄漏，实测排查方向应包含隔板纸散尘（已有数次客户投诉实例）；市场口径：国外有隔板过滤器价格高于无隔板、使用场所较少，无隔板V形通道容尘更均匀寿命更长"
    }
  ]
}